TODO: pack16 SRAM bridge for the Cmod A7 (512 KB main memory at 27-33 MHz)

Full path: Verilog/fpga/cmod-a7-35t/SRAM-BRIDGE-PLAN.md Date: 13-JUL-2026. Status: PLANNED, not started. The first-version Cmod build (build.tcl in this directory) uses BRAM main memory; this plan upgrades it to the on-board 512 KB SRAM = 256K ND words, 4-8x the BRAM ceiling.

0. Why pack16 is mandatory (validated 13-JUL-2026)

Verilog/docs/basys3-memory-speed-validation.md section 4.3 invalidated the originally recorded plan (~4 byte-accesses per 18-bit word): the protocol budget is 3 OSC cycles from column-known (N+1) to data-valid (start of N+4), no wait states possible, so a 4-beat-per-word scheme misses the deadline AT ANY FREQUENCY. The only viable shape is pack16: store the 16 DATA bits as 2 bytes, drop the 2 parity bits, regenerate parity on the read path (odd parity, AM29833A convention) - the exact contract already proven on the Tang (ND_SDRAM_PACK16, semantics pinned by Verilog/docs/nd120-parity-analysis.md: the self-test never reads stored parity; runtime uses only the PES/PEA/IIC error machinery).

Validated envelope: comfortable at <= 33 MHz OSC, zero-slack at 40 MHz on the Cmod's dedicated short traces. At the build's 27 MHz (37.04 ns/cycle, budget 111 ns) there is real margin.

1. Hardware facts

  • SRAM: ISSI IS61WV5128BLL-10BLI - 512K x 8, async, tAA 10 ns (datasheet https://www.issi.com/WW/pdf/61-64WV5128Axx-Bxx.pdf; the "8 ns" sometimes quoted is the faster bin - use 10 ns for margin math).
  • Dedicated FPGA pins (NOT the Pmod, NOT the DIP pins - no conflict with anything): 19 address MemAdr[18:0], 8 data MemDB[7:0], and control (RamOEn, RamWEn, RamCEn) - all in Cmod-A7-Master.xdc in this directory (Sch=sram-a[]/sram-dq[]). Single 3.3 V rail, no level issues.
  • Capacity as pack16 main memory: 512 KB / 2 bytes per word = 262,144 ND words = one quarter of an ND bank plus... = 256K words. Boot-time memory sizing detects it (partial-memory machines were normal; row-granular presence like CPU_PART_ROWS on the Tang bridge).

2. Bridge design (MEM_RAM_49_SRAM.v, sheet-49 backend)

New file Verilog/fpga/cmod-a7-35t/MEM_RAM_49_SRAM.v implementing the sheet-49 contract (same interface as MEM_RAM_49_BLOCKRAM / MEM_RAM_49_SDRAM; the contract table is in Verilog/docs/nd120-dram-memory.md section 1), selected in MEM_43.v by a new define MAIN_RAM_SRAM in the existing backend chain (MAIN_RAM_SDRAM / MAIN_RAM_BLOCKRAM / VERILATOR_SIM / default - add the new arm, everything else untouched).

Single clock domain: the bridge runs on OSC (= clk_cpu = sysclk on FPGA, one domain in FF mode) - no CDC, no second PLL output needed at 27-33 MHz. (Only a 40 MHz attempt would want a 2x clock to create mid-cycle address-change points; out of scope here.)

Cycle-by-cycle at 27 MHz (37 ns/cycle; SRAM round trip per byte: Tco+OBUF ~5 + trace <1 + tAA 10 + IBUF+setup ~5 = ~21 ns - fits ONE cycle with 16 ns slack):

READ (MWRITE50_n=1):
  N   : RAS rise seen - capture row (AA_9_0), bank/partition presence
  N+1 : column on AA - drive MemAdr = {row, col[9:1], 1'b0} (byte 0 = low)
  N+2 : capture MemDB -> byte_lo; drive MemAdr byte 1 (addr | 1)
  N+3 : capture MemDB -> byte_hi; assemble
        DD_17_0_OUT <= {~^hi, hi, ~^lo, lo}  (parity regenerated)
        -> registered, driven from start of N+4 while CAS high. DEADLINE MET
          with one cycle of the >=2-cycle-per-byte margin unused at 27 MHz.
  CORR_n: computed word is always "correct" - same formula as the Tang
  bridge (CORR_n = (^dd[8:0]) & (^dd[17:9]) evaluates to 1).

WRITE (MWRITE50_n=0):
  DD_17_0_IN valid at N+2 (use the OR-accumulation capture only if the
  Cmod shows the same sub-cycle drive pulse as the Tang did - START simple:
  direct registered capture at N+2/N+3, escalate to OR-accumulation only
  on evidence).
  N+3 : write byte 0 (MemDB driven, RamWEn low one cycle, address settled
        at N+2) - async SRAM tSA/tPWE at 10 ns grade fit a 37 ns cycle
  N+4 : write byte 1
  Budget: RAS-to-RAS floor is 11 cycles - both byte writes finish by N+5,
  6 cycles of slack. Writes are never the constraint.
  IMPORTANT: MemDB is a bidirectional bus - drive it ONLY during write
  strobes (the clean top-level ternary 1'bz idiom, exactly like
  sdram18.v's SDRAM_DQ - Vivado infers IOBUFs; keep the tristate at the
  TOP-LEVEL assign, never nested in an inner ternary).

Partition/presence: parameter like the Tang's CPU_PART_ROWS - the SRAM holds 256K words = ND rows 0..255 of BANK0 ({bank,row} < 256); rows above report absent (read 0, writes dropped), boot sizing shrinks accordingly.

3. What must be written (work list)

  1. MEM_RAM_49_SRAM.v - the bridge above (~150-250 lines; the Tang MEM_RAM_49_SDRAM.v is the structural template, minus controller/CDC).
  2. MEM_43.v - one new elsif MAIN_RAM_SRAM arm + the MemAdr/MemDB/ control ports threaded up through ND3202D.v -> ND120_TOP.v (under ifdef MAIN_RAM_SRAM, mirroring how the SDRAM pins were threaded for the Tang - see that diff for the pattern).
  3. nd120_cmod_top.v + nd120_cmod.xdc - add the 30 SRAM pins from Cmod-A7-Master.xdc (uncomment/rename), pass through the wrapper.
  4. Testbench BEFORE hardware (registered in Verilog/tests/run_all_tests.sh, TB_RESULT: PASS): protocol-replay tb mirroring Verilog/fpga/tang-nano-20k/sdram-bridge/sim/mem_ram_49_sdram_tb.v (measured 6-cycle access signature, late-N+4/N+5 sampling, adjacent-word independence, bad-parity absorption, partition boundary, 2000-access soak) plus a behavioral IS61WV model with real tAA delay so the one-byte-per-cycle assumption is actually exercised.
  5. Vivado build variant: build.tcl -tclargs -sram (or a second tcl) with MAIN_RAM_SRAM; keep the BRAM build as the fallback.
  6. Timing: the WNS gate in build.tcl already fails loudly; the SRAM pins need set_output_delay/set_input_delay constraints against sys_clk derived from the ~21 ns round-trip budget (write them from the datasheet numbers, don't skip - unconstrained I/O timing is how silent corruption ships).

4. Acceptance

  • Protocol tb PASS (incl. the SRAM-latency model), registered in the suite.
  • Vivado timing met at 27 MHz with the I/O delays constrained.
  • On hardware: boot banner + self-test unchanged, OPCOM deposit/examine round-trip across the 256K-word range, boot sizing reports the partial bank, and the runSim-golden console behavior unchanged on the Verilator side (the define is FPGA-only, Verilator never sets it).

Estimated effort: 2-4 days (bridge + tb are the bulk; the plumbing through ND3202D/ND120_TOP is mechanical but wide).